The Ras Al Khaimah casino sits inside the wider Wynn Al Marjan Island development on Al Marjan Island, and as of 10 August 2026 it still hadn't opened to the public. Wynn's latest official guidance targets September 2027 for welcoming guests.
This panel keeps finished milestones separate from what's still planned, and dates every figure that could change. Because the opening date and other operating details remain subject to shift, each line points back to the latest official reference we have.
| Item | Confirmed status | Reference date |
|---|---|---|
| Resort status | Under construction, not open for visits | 10 August 2026 |
| Opening date | September 2027 | Wynn results, 4 August 2026 |
| Licence | Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, appears on the GCGRA register | Current GCGRA register |
| Tower | 70 floors, with a final planned height of 352 metres above sea level | Current resort website |
| Accommodation inventory | All 1,530 units structurally complete | 2 February 2026 |
| Gaming area | 225,000 sq ft, about 20,900 sqm | Wynn 2025 annual filing, March 2026 |
Being under construction doesn't translate into rooms, restaurants or the gaming floor being open for booking or entry. Wynn currently runs an email sign-up for updates, but filling that in is not a reservation and not an admission ticket.
Wynn Al Marjan Island is Wynn's first integrated resort anywhere in the Middle East and North Africa, and the developers call it the UAE's first integrated resort as well. The plan gathers a hotel, a licensed gaming facility, dining, entertainment, retail, a spa, a beach, a marina and an events centre into one destination.
The project covers more than 60 hectares on Al Marjan Island in Ras Al Khaimah, facing the Arabian Gulf. It's a joint venture between entities tied to Wynn Resorts, Marjan and RAK Hospitality Holding, though the name on the gaming licence register is Island 3 AMI FZ-LLC.
That label matters because this isn't simply a gaming floor with a hotel bolted on. Nearly everything published so far concerns accommodation, restaurants, beach facilities, events and entertainment, while the actual game mix hasn't been detailed yet.
On 4 August 2026, Wynn said in its second quarter results that the resort's doors will open to guests in September 2027. That's the newest named month on record, and it supersedes pages that still list only 2027, first quarter 2027 or spring 2027.
Earlier investor updates had targeted the first quarter of 2027, and in May 2026 Wynn flagged a modest delay it said it would quantify later. The August release supplied that missing number, shifting current guidance to September 2027.
A company results release carries more weight than a property listing or travel blog, but it's still forward-looking guidance for a resort being fitted out as we speak. Recheck the official resort website and Wynn's investor releases before paying for anything non-refundable.
Lining up each announcement in order keeps an old target from being mistaken for the current one. It traces how the Ras Al Khaimah casino moved from an early proposal to a licensed facility under construction with an actual named opening month.
| Date | Milestone | What it means |
|---|---|---|
| 25 January 2022 | Joint project announced for Al Marjan Island | The concept launched with preliminary scope and timing |
| 4 October 2024 | Wynn announced receipt of the commercial gaming facility operator licence | The project turned into the UAE's first licensed commercial gaming facility |
| 25 November 2025 | A site ceremony marked the 70-floor hotel tower reaching its top | The main tower reached a visible construction milestone |
| December 2025 | Wynn's later updates recorded structural concrete completion | Work moved further into the crown, facade and interior phases |
| 2 February 2026 | Facade reached 83%, all accommodation units were structurally complete and Wynn Bridge reached 48% | This stands as the latest detailed construction percentage release |
| 11 March 2026 | Construction resumed after a short pause | This counted as a status update, not an opening or cancellation notice |
| 29 June 2026 | Wynn announced an original theatre production with Punchdrunk | The opening entertainment programme picked up a confirmed headline show |
| 15 July 2026 | Wynn's investor presentation showed extensive interior work in progress | The latest visual snapshot showed the fit-out phase was active |
| 4 August 2026 | September 2027 was named for opening the doors | This is the current official date for planning purposes |
One Wynn project story dated the 70-floor topping-out ceremony to 25 November 2025, while later corporate updates place the structural concrete milestone in December 2025. November here refers to the site ceremony and December to the later construction record, kept apart rather than merged into a single date.
Wynn's 2 February 2026 release put structural concrete at complete through the level 71 roof, with 21,852 of 26,471 facade panels fitted, or 83%. The guest-facing website calls it a 70-floor tower, and both descriptions run side by side here rather than being merged into one derived floor count. Wynn's releases have also cited different interim height figures along the way, though the published target holding steady is 352 metres above sea level once the spire goes on.
Elevator and escalator installation was under way, alongside mechanical, electrical and finishing work across the guest inventory. Combined concrete and structural steel work on the low-rise buildings had reached 99%, though that percentage says nothing about whether those spaces are actually ready for guests.
The new 548-metre Wynn Bridge is meant to connect the resort, via Wynn Boulevard, to the E311 and E611 roads. As of 2 February 2026 it stood 48% complete, with piling finished and nine of the ten bridge column pile caps in place, and Wynn was targeting completion by late 2026.
Wynn's August results called construction rapid, and its second quarter presentation showed extensive interior work as of 15 July 2026. Neither source updated the facade or bridge percentage, so the February figures stay clearly dated here rather than getting nudged upward by guesswork.
Wynn's annual report for 2025, filed in March 2026, puts the gaming area at 225,000 sq ft. Converted, that's roughly 20,900 sqm, and it's the figure this guide relies on since it comes from the newest direct corporate filing.
An approximate 18,500 sqm gaming floor keeps turning up across older property and news coverage, including a number of results you'd still find in a search today. Wynn hasn't published anything reconciling the two numbers or clarifying whether they describe different spaces, so 18,500 sqm stays labelled as the older estimate, never combined with the newer figure.
| Measure | Figure used | How to read it |
|---|---|---|
| Gaming area | 225,000 sq ft, about 20,900 sqm | Latest figure in Wynn's annual filing |
| Older figure still repeated online | About 18,500 sqm | An older estimate, not the current lead figure |
| Development site | More than 60 hectares | The full integrated resort, not just the gaming floor |
| Hotel tower | 70 floors | Current guest-facing description |
| Structure in the February update | 299 metres through the level 71 roof | A dated construction measurement, not final height |
| Planned height with spire | 352 metres above sea level | Final architectural target on the resort website |
Floor area alone says nothing about the number of gaming tables or slot machines, the game mix, or how space splits between general and private rooms. Wynn hadn't published any of that by 10 August 2026, so a precise inventory will need to come from a newer operator source.
Wynn's February construction update reported all 1,530 accommodation units as structurally complete, with interior fit-out still ongoing. The breakdown below folds the apartments, townhomes and estates into that same total, so none of them get counted a second time.
| Category | Number | Published description |
|---|---|---|
| Resort rooms | 1,217 | Rooms and suites in the main Resort Tower |
| Enclave suites | 297 | A hotel within a hotel on the upper floors |
| Royal Apartments | 2 | Two apartments at the top of the tower |
| Garden Townhomes | 4 | Standalone garden accommodation in the resort plan |
| Marina Estates | 10 | Residences beside the marina |
| Total | 1,530 | Current announced guest inventory |
Enclave is Wynn's hotel-within-a-hotel concept occupying the upper floors, complete with its own entrance, arrival area and lifts. It's built around suite accommodation and a separate service environment, though rates, packages and a reservation opening date are all still unannounced.
The 1,542 figure comes from older Wynn releases and keeps getting recycled by competitors. The February 2026 construction release and today's resort materials lay out a full category breakdown that totals 1,530, which is the number this guide uses.
The current resort website plans for 22 restaurants, bars and lounges, plus a daytime beach club, serving both hotel guests and resort visitors. Wynn has named a French-American steakhouse from Alain Ducasse and a Delilah supper club, though restaurant bookings hadn't opened as of this update.
On 29 June 2026, Wynn announced an original Punchdrunk production timed to debut alongside the resort. Once bookings open, guests should be able to pick between a traditional seated show upstairs or a roaming, immersive journey downstairs and backstage, though show dates and prices haven't been released.
The plans include a naturally lit shopping parterre built for luxury brands, though Wynn hasn't released the full list of shops. Its art collection will run through both public spaces and guest rooms, with confirmed highlights including Jeff Koons' 11-metre Tulips alongside historic and contemporary works from regional and international artists.
The plans set aside 420 metres of private white-sand beach and a deep-water marina built to take in large yachts. A daytime beach club is planned too, though day passes and non-guest access rules haven't been published yet.
Wynn lists 12 pools with cabanas and landscaped surroundings, plus a five-star spa, salon and fitness centre. Treatment prices, opening hours and pool admission rules are all still unavailable, so a reliable visit budget simply can't account for them yet.
The official amenities list names a kids' club alongside outdoor recreation, which signals the resort's non-gaming spaces are built for families as well. Accepted ages, fees and supervision arrangements haven't been released, so families should hold off planning childcare until the guest policy appears.
Coral Court is the resort's dedicated events and celebrations centre, with a published area of 7,708 sqm. It's set to hold six reconfigurable meeting rooms, separate salons for brides and grooms, and private prayer rooms for men and women.
The Grand Ballroom spans 2,633 sqm, runs column-free and looks out over the marina. That figure is useful for comparing venues, but it doesn't fix a capacity, since seating shifts depending on tables, stages, aisles and production equipment.
Wynn hadn't published venue packages, prices or minimum spends by 10 August 2026. Once sales open, ask for a written capacity plan and a quote that covers production, catering, cancellation and accessibility, rather than guessing attendance from floor area alone.
The resort sits on Al Marjan Island in Ras Al Khaimah, not Dubai. Wynn's website puts Ras Al Khaimah International Airport at about a 15-minute drive away, while a 2025 Wynn financing release estimated the trip from Dubai International Airport at roughly 50 minutes.
| Starting point or route | Official information | Planning decision |
|---|---|---|
| Ras Al Khaimah International Airport | About 15 minutes by car on the resort website | Check the journey time on arrival day since traffic changes |
| Dubai International Airport | About 50 minutes in Wynn's 2025 release, with the resort less than 50 miles away | Add baggage and traffic time rather than treating the estimate as a promise |
| Wynn Bridge | Planned link through Wynn Boulevard to E311 and E611 | Late 2026 was the completion target, so confirm the route is open |
| Resort shuttle | No operating timetable or fare published | Don't plan around a service the operator hasn't announced |
| Parking and valet | Final operating details not published | Check arrival instructions when reservations open |
The 548-metre bridge is meant to link the resort more directly into the wider road network, but the most recent detailed release still described it as work in progress. Don't assume it's open until Wynn confirms completion, or a current mapping service verifies the route.
Confirm the actual drop-off point once bookings open, since the hotel, events centre and marina could each use a different entrance. Build in contingency time, and don't pay for any transfer that isn't named in a written reservation confirmation.
The GCGRA licensee register lists Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, under land-based gaming facilities. Wynn announced on 4 October 2024 that this project entity had received the UAE's first commercial gaming facility operator licence.
The register confirms the named entity holds a GCGRA licence covering this specific land-based facility. It lists The Game LLC separately as operator of the UAE Lottery, underlining that land-based facilities and lottery products sit in different licence categories. Once it opens, Wynn Al Marjan is positioned to become the first licensed casino in the Gulf Cooperation Council, and the wider regulatory picture is covered on our UAE gambling laws page.
Before it can welcome players, Wynn still has to publish final age, identity, admission, responsible gaming and complaints arrangements for the gaming floor. Until those terms exist, entry rules published for other Wynn properties simply don't carry over to this one.
Operating details commonly shift in the run-up to a resort opening, so flagging what's still unknown matters just as much as listing what's confirmed. This table exists to stop an email sign-up, a design render or a third-party offer from being mistaken for an actual booking or operating promise.
| Detail | Status on 10 August 2026 | What to do |
|---|---|---|
| Hotel bookings and room rates | Reservation date and prices not announced | Join official updates and wait for Wynn's booking system |
| Restaurant reservations | Not open on Wynn's dining page | Don't pay an unverified intermediary for a table |
| Casino game list | Table, machine and title counts not published | Wait for the operator's gaming information |
| Betting limits | Minimum and maximum stakes not published | Don't borrow limits from Wynn Las Vegas |
| Age, ID and admission charges | Final Wynn conditions not published | Check Wynn and GCGRA before travelling |
| Dress code and opening hours | Not published | Review the guest guide when it appears |
| Shuttle, parking and valet | No operating timetable or pricing published | Request confirmation with the hotel booking |
| Theatre tickets | Interest registration available, schedule and prices incomplete | Don't treat registration as a ticket |
Wynn's website collects email addresses and stated interests purely for news and early updates. That step reserves nothing, room, restaurant or theatre seat included, and it locks in neither a price nor priority absent a separate booking confirmation.
Begin with the resort website, verify the licence against the GCGRA register, and check the opening date against Wynn's newest investor release. If a detail is absent from those official channels, treat it as unannounced rather than filling the gap using another resort's policy.
This page, and its gaming content, is written for adults aged 18 and over, while GCGRA advertising standards set the underage threshold at below 21 for commercial gaming other than lottery. Wynn hadn't published its final gaming-floor identity and admission policy as of this update, so confirm it before you travel and don't assume hotel access covers every part of the resort.
Say a future one-day entertainment budget comes to 800 United Arab Emirates dirhams (AED), purely as a worked example and not a Wynn price. You might put AED 500 aside for transport, food and contingency, then set AED 300 as the absolute gaming limit no matter what happens.
Fix both the spending limit and the time to stop before you enter the gaming area, and leave extra cards or funds outside the plan entirely. Once either limit is hit, walk away rather than shifting contingency money into a fresh stake or trying to chase a loss back.
Stop if gaming starts producing hidden spending, borrowing, anxiety, or neglect of work and relationships. Our responsible gambling guide goes deeper into warning signs, a stopping plan and support options.
These answers draw on official information available as of 10 August 2026. Recheck the opening date and entry terms once reservations start, since operating details down the line can still change.
No, the resort is still under construction. Wynn stated on 4 August 2026 that it plans to open its doors to guests in September 2027.
Wynn's current official guidance points to September 2027. That date came out of its second quarter results on 4 August 2026 and replaces older guidance naming the first quarter or spring of 2027.
The resort is on Al Marjan Island in the emirate of Ras Al Khaimah, not Dubai. Wynn says Ras Al Khaimah International Airport sits about 15 minutes away by car.
Wynn's latest annual filing states 225,000 sq ft, which works out to about 20,900 sqm. The approximate 18,500 sqm figure traces back to older project coverage, so this guide relies on the newer company filing.
The current total comes to 1,530 accommodation units, made up of 1,217 Resort rooms, 297 Enclave suites, two Royal Apartments, four Garden Townhomes and 10 Marina Estates.
The General Commercial Gaming Regulatory Authority, GCGRA, issued the licence to Island 3 AMI FZ-LLC, trading as Wynn Al Marjan. Wynn announced it had received the UAE's first commercial gaming facility operator licence on 4 October 2024.
Not yet. Wynn hadn't announced a hotel reservation opening date by 10 August 2026, and its dining page said restaurant bookings weren't open. Joining the email list isn't a booking and doesn't guarantee a rate or priority.
Wynn hadn't published a table game list, slot count or betting limits by 10 August 2026. Wait for the operator's gaming information and entry terms rather than borrowing details from another Wynn resort.
Wynn gives an approximate 15-minute drive from Ras Al Khaimah International Airport, and has previously put the trip from Dubai International Airport at about 50 minutes. Journey times depend on traffic, and Wynn Bridge was still described as under construction in its February 2026 update.
GCGRA advertising standards define anyone under 21 as underage for commercial gaming other than lottery. Wynn hadn't published its final gaming-floor ID and admission rules by 10 August 2026, so visitors should check Wynn and GCGRA terms before they travel.